911
Incoming Calls
Active
Active Incidents
Loading incidents…
Log
Recently Closed
Loading incidents…
Drill
Training Log
New IncidentNot Saved
IRR
Initial Radio Report
Building / Area Description
Size
Height (Stories)
Type or pick from the list.
Problem Description
Location of the Problem
Floor
Initial Incident Action Plan
Tasks (Select All That Apply)
Location
Objectives (Select All That Apply)
Strategy
Resource Determination
Assume & Name Command
Initial Radio Report Preview
Make selections above to build the report.
What’s new in Version 2.0
- Incidents tie every tab together. The Log has Active, Recently Closed, Find by date, and a Training Log
- Active911 Incoming Calls: start an incident from a call with the address, dispatch notes, and dispatched units already on scene
- Auto-save with Confirm, and an Incident History that notes who changed what
- Unit Assignments status board with Completed, CRR units, and a Mutual Aid section
- Incident Objectives: benchmarks (All Clear, Fire Control, Secondary, Loss Stopped), checklist, and floor-by-floor grid
- Incident clock with 10-minute PAR reminders, and a PAR tab for units on scene
- Who’s on the board, Training mode, and PDF export of closed incidents
What’s new in Version 2.1
- Divisions and Groups on Unit Assignments, with leaders, floor-locked interior divisions, group task pre-select, and one-tap division PAR
- RIC Established on the checklist, linked to On Deck, with a warning if RIC is lost
- New units: Fire Chief (Command section), Reserve Rigs (Engine 50, 70, 80, Truck 90), and Mutual Aid (185th, Sgt Bluff, SSC, NSC, Hinton, and Other)
- Status Board scrolls to the unit being assigned, then back to the next unit needing assignment
- Incident Objectives: Structure Fire Benchmarks with Fire Control listed first
- IRR task added: Investigate (reads “Investigating” in the report)
- On Deck now comes before Water Supply in the task list
- Training mode button moved to the top-left corner
- Opening an incident from the Log puts its header at the top; section tabs fill the row
- Divisions and Groups: pick several at once; leaders are chosen from the units assigned to them
- Structure Fire Checklist: Rehab Established
- New tasks: Staging, Triage, Treatment, and Transport (also as Groups); Mass Casualty checklist checks off when they are assigned
- Incident Objectives: Technical Rescue tab (OP 3.00–3.09, pick the rescue type), Gas / CO / Utility tab (OPs 1.19, 1.20, 1.34), and a High-Rise checklist on Structure Fire (OP 1.08) that turns on when the IRR height is more than 4 stories
- Incident Objectives tabs: Structure Fire (default), Haz-Mat, Active Threat, and Mass Casualty, each with its own benchmarks and checklist, plus a patient count for Active Threat and Mass Casualty
- Floor picker suggests the IRR problem floor (dashed outline)
- Chief 19 or the Fire Chief is assigned Command on arrival when no one else has it
- Faster loading: smaller logo and unused spreadsheet code removed
- Fixed: PDF export for training incidents
